As we were doing our annual folder cleanup, we ran across a handful of pictures taken as we built our new studio. We are starting with our “Output Sidecar” in its unassembled state.
We didn’t take pictures of all 2,540,016.5 screws, nuts & bolts required. This really only gives you a 100,000-foot view of the number of parts required to assemble everything.
No complaints – we are Thrilled with the final results.
It has a slide-out shelf, a second adjustable shelf, standard 19in mounting h/w for miscellaneous modules and a slide-out wire management option behind the door on the right.
During assembly you can build as left or right handed version depending on your needs.
The base of the new desk assembled, followed by the fully assembled desk. Next, move all of the other equipment in place and tackle re-cabling everything.